Snohomish Terrace Mixed Use Project

The Snohomish Terrace project received site development plan approval in 2025.  The applicant submitted plans for site construction in July, 2025.  This project is located on the former Snohomish County Public Works site, with frontage on both Bonneville Avenue and Avenue D, in the Midtown District.  

The applicant is proposing two mixed-use buildings adjacent to Avenue D, collectively containing 115 residential units and ground-floor commercial uses, in addition to 106 townhome units adjacent to Bonneville Avenue (the revised proposal may include a reduction in townhome units, with individual ownership proposed). The mixed-use buildings will incorporate underground parking accessible from within the site, commercial space on the Avenue D level, and three floors of residential units above. The project also includes open parking areas, site and frontage improvements, utilities, landscaping, children’s play areas, public plazas, and open space.

Documents related to this project are below.  

SDP24-0036 site

Clicking the links below will direct the user to an external website (the Permit Portal).

Access all documents related to the land use approval, File #SDP24-0036

Access all documents related to the construction permit application, File #CV25-0037

  1. Brooke Eidem, AICP

    Planning & Development Services Director

  2. Katie Hoole, CPT

    Permit Coordinator

  3. Thomas Kreinbring

    Associate Planner

  4. Serena Dudas

    Associate Planner

  5. Koi Simpson

    Building Official

  6. Cedric Atkins

    Assistant Building Official

  7. Daniel Rohlfing

    GIS Specialist